Skip to content
During Radiated Emissions (RE) testing, Emissions radiating from the Equipment Under Test (EUT) are measured in order to confirm that the EUT is not producing levels above specified limits which could affect other equipment. An integrated Radiated Emissions system is included along with an Antenna, Analyser / Reciever, Pre-Amplifier (if required), RF Cable, as well as a Tripod / Stand with adaptors suited to the devices provided. EMC Hire engineers will select equipment based on the customer's needs, so please provide as much information as possible (e.g. applicable standard, limits, distance, etc.). The measurement device can be Low Frequency E-Field Antenna, Low Frequency H-Field Antenna, HF-VHF Antenna, VHF-UHF Antenna, Microwave Antenna, depending on the standard. A laptop containing RadiMation test software is included in the system, which will be preloaded with the appropriate test configurations including factors. A software operating procedure is also included to guide you through using the software aswell as set-up photos to help you assemble the equipment. We invite you to visit our facility for a demonstration and training, or EMC Hire can provide an engineer to set up the system at your location if necessary, or provide remote assistance via Teamviewer or Teams.
The Weekly Signal

EMC Hire newsletter

The Weekly Signal

A practical weekly update for engineers, technicians and anyone working with EMC testing. Receive useful guidance, technical articles and real-world lessons directly from EMC Hire.

Technical guidance

Practical EMC testing advice and useful engineering explanations.

EMC Banana Skins

Real-world mistakes, unexpected problems and lessons worth sharing.

One email a week

A concise weekly roundup with no unnecessary noise.

Join The Weekly Signal

Enter your email address and confirm your subscription from your inbox.

We use double opt-in to confirm your subscription. You can unsubscribe at any time. See our privacy policy .